Our Layout Survey Process, Step by Step
- Site visit: We review the location, access, approved drawings and available benchmarks before setting out.
- Control points: Control is established from relevant benchmarks so the marked points share a defined reference.
- Field work: Total Station and DGPS are used as required to mark building, road, plant or utility positions.
- Data processing: Observations and check measurements are organised to document the setting-out work.
- Drawings and report: Setting-out coordinate sheets, check records and as-marked drawings are prepared for the project team.